NASG
Store
News
Events
Clubs

Current Layout by Gregg Wujcik

Layout Name:

"Lake Superior Northern Railroad"

Official Web Site:

Layout Status:

active

Track Type:

S

Layout Space:

18.5' x 18.5'

Layout Style:

Point-to-point, walk-in

Track Manufacturer:

Shinohara, Tomalco, handlaid (Fast Tracks)

Rail Size:

code 100

Min. Turnout Frog:

#6

Min. Radius:

36"

Track Height(s):

48" to 54"

Completed:

benchwork: 100%; track: 25%; scenery: 0%

Era:

1968-1972

Setting:

Michigan's Upper Peninsula

Railroad(s) Modeled:

freelance, SOO, C&NW

Control System:

DCC (Ring Engineering RailPro)

Notes:

An operations-oriented layout that was started in 2018. Many more construction photos are available on Gregg's web site.


(copyright © Gregg Wujcik; used by permission)

(copyright © Gregg Wujcik; used by permission)
Layouts
Product Gallery
How-to
Resources
Site